Finn Kahu opened a question in Operate, about automation: this is probably basic, but I’ve started saying yes to scope creep because I’m scared the client will walk. Fixed fee, and every 'small ask' is now a normal Tuesday. Isaac Mehta's answer was accepted as the solution: I used to treat every small ask as relationship insurance. 3 other replies add further detail below.

4
SolvedAutomation

How do you stop fixed-fee extras from eating the month?

Finn Kahugbeya team

This is probably basic, but I’ve started saying yes to scope creep because I’m scared the client will walk. Fixed fee, and every 'small ask' is now a normal Tuesday. I already put assumptions and exclusions in the SOW, but when they email 'can you also…' I just do it and bill nothing. Keeps the relationship safe, keeps the margin gone. I can’t afford to lose this account yet, so what actually works when you’re not in a strong position to push back?

4 answers

  • 0
    Isaac Mehtagbeya team Accepted answer

    I used to treat every small ask as relationship insurance. It isn’t. It trains the client that scope is negotiable by email, and the ones who leave when you set a boundary are usually the ones you were losing money on anyway. We tested a line in the next SOW: extras under 30 minutes are free once a week, anything after goes through a change request and is billed. I expected pushback. There was none. Two clients left over it later, both were exactly this kind of client, and I don’t regret either. What I’d do differently: say the free-extra rule in the kickoff call instead of hiding it in the document. It changes the conversation from 'you’re charging me' to 'this protects the schedule you’re paying for.' If you can’t afford to lose the account, at least make the next one cheaper to service.

  • 0
    Adaeze Ibrahimgbeya team

    Are the extras inside the original risk area, or genuinely new work? I stopped negotiating each ask emotionally once I separated those two. The first is under-scoping. The second is change control, and it needs a same-day cost line, not a bigger SOW.

  • 0
    Mutiso Mwangigbeya team

    I send the quote before I do the extra. No addendum, no free hour. One client walked.

  • 0
    Tariq A. Faroukgbeya team

    Don’t offer the free first thirty minutes. You’re still teaching them extras are free until an invisible line. I tested both. The thing that stuck was a change order template I could send in two minutes. It says what’s added, what it costs, what it replaces. Client signs or we don’t start. Most sign. The few who didn’t were never going to pay. It removed the conversation I was dreading.

Highlights from this conversation

Answers so far

  • “Accepted answer. I used to treat every small ask as relationship insurance. It isn’t. It trains the client that scope is negotiable by email, and the ones who leave when you set a boundary are usually the ones you were losing money on anyway. We tested a…” Isaac Mehta
  • “Don’t offer the free first thirty minutes. You’re still teaching them extras are free until an invisible line. I tested both. The thing that stuck was a change order template I could send in two minutes. It says what’s added, what it costs, what it…” Tariq A. Farouk
  • “Are the extras inside the original risk area, or genuinely new work? I stopped negotiating each ask emotionally once I separated those two. The first is under-scoping. The second is change control, and it needs a same-day cost line, not a bigger SOW.” Adaeze Ibrahim
  • “I send the quote before I do the extra. No addendum, no free hour. One client walked.” Mutiso Mwangi

Explore this topic

This question sits in Operate, which holds 94 conversations. Running the business without chaos: CRM, automation, workflows, finance, delegation and productivity.

Related discussions

Go deeper

Reference pages that cover the practical side of this topic.

Browse every public discussion